Fit for 55
Fit for 55
The European Commission presents the fit for 55 plan. With the Corwd Balancing Platform we drive decarbonization of the European Energy Balancing System and contribute to this massive challenge for all of us.
The European Commission presents the fit for 55 plan. With the Corwd Balancing Platform we drive decarbonization of the European Energy Balancing System and contribute to this massive challenge for all of us.
TenneT NL
TenneT Netherlands
Utrechtseweg 310
6812 AR Arnhem
E: BSP@tennet.eu
For becoming a BSP and delivering aFRR via the CBP and aFRR information
E: mascha.peper@tennet.eu
General CBP information
TenneT DE
TenneT Germany
Bernecker Strasse 70
95448 Bayreuth
E: mascha.peper@tennet.eu
General CBP information
Swissgrid
Bleichemattstrasse 31
P.O. Box
5001 Aarau
Switzerland
T: +41 58 580 21 11
E: evangelos.vrettos@swissgrid.ch
For inquiries related to the pilot project(s)
E: stavroula.margelou@swissgrid.ch
For inquiries about the FCR operationalization project
E: marek.zima@swissgrid.ch
For general inquiries
Terna
Terna S.p.A. - Rete Elettrica Nazionale
Roma - Viale Egidio Galbani, 70 - 00156
T: +39 06 8313 8111
E: fabio.dininno@terna.it
T: +39 06 8313 8286
Stakeholders relations
APG
Austrian Power Grid AG
Wagramer Straße 19 (IZD Tower)
1220 Vienna
T: +43 (0) 5032 0161
E: markus.riegler@apg.at
TransnetBW GmbH
Osloer Str. 15-17,
70173 Stuttgart
T: +49 170 844 8442
E: a.jung@transnetbw.de